Factory and Site Acceptance Testing :: Solutions & Services :: Life Cycle Engineering

Factory and Site Acceptance Testing

Back to Reliability Services Page

As much as 95% of a capital asset’s life cycle cost is determined before it is installed, so without factory and site acceptance testing plants run the risk of not getting what they think they purchased. Abnormally high operating and maintenance cost and chronic reliability problems can drive a capital asset’s life cycle cost 40-60% higher when factory and site acceptance testing is not included in the functional specifications and made a part of the procurement process.

You can avoid these higher life cycle costs by engaging Life Cycle Engineering (LCE) to develop and supervise factory and site acceptance tests that will confirm that new or rebuilt capital assets comply with functional specifications and engineering best practices.

Scope of Services:

Approach:

A qualified Reliability Engineer will:

Deliverables:

LCE will generate a formal report that confirms compliance with engineering best practices and the functional specifications of the capital asset(s) and/or will define each of the deviations from these practices or specifications. The report will:

Back to Reliability Services Page


For More Information on Factory and Site Acceptance Testing

843.744.7110 | info@LCE.com

 

Learn More About Risk-Based Asset Management Course
Sign up for Rx Today - Discover ways to improve plant performance.
Life Cycle Engineering Articles
Rx Definitions Reliability Excellence
Life Cycle Institute Changing Behavior to Produces Results