USSC Agriculture Division Harvests Success From Implementing Reliability Excellence

No data was found

USSC_Agriculture_Division_Harvests_Success_From_Implementing_Rx

The Background

U.S. Sugar is the country’s largest, vertically integrated producer of sugar cane and refined cane sugar. Dependent on weather, growing conditions, and federal market allocations, U.S. Sugar produces 700,000 tons of cane sugar a year, providing nearly 10% of the sugar produced in America. With its headquarters in Clewiston, Florida, the company farms over 150,000 acres of sugar cane which represents about 75% of their total cane supply. The remaining 25% is supplied by approximately 45 independent farmers.

The Agriculture Division manages cane production on company owned and leased lands through five Key Focus Areas including Foundation, Production/Operations, Research and Development, Reliability Excellence, and Financial performance.  Production/Operations processes primarily consist of Planting, Growing, and Harvesting.  Fields are planted every three to four years in the August to December time period and harvested, 24 hours a day, in the October to April time period. Over two thousand pieces of equipment are utilized, including tractors, farm implements, harvesters, cane haul wagons, loading stations, vehicles, pumps, power units, etc.

Early in 2007, the Agriculture Division identified Reliability Excellence as a strategic improvement initiative and partnered with Life Cycle Engineering.  A Site Assessment for the Agriculture Division was completed in March, 2007, and provided the roadmap needed for their journey of improvement with Reliability Excellence.

The Challenges

The Reliability Excellence Site Assessment revealed many opportunities for improvement in the Agricultural Division, including:

  • There were no meaningful metrics in place by which to measure production availability, throughput, or production losses (OEE), nor were there any metrics in place to determine scheduling efficiency or compliance or Preventive Maintenance compliance.
  • Maintenance work process was limited to some PM’s and emergency work.
  • Operator Care for harvesters and farm production equipment was minimal.
  • Major asset groups, such as irrigation pumps and product elevators, were in a regressive state with no formal plan for asset restoration.
  • The technical skills of the Maintenance Crafts were at a fundamental level or less. There was a need for development of a comprehensive Skills Enhancement Strategy, beginning with an assessment of current skill levels of all maintenance personnel.
  • The division was in an extremely reactive environment with no Work Management Strategy or processes being followed. There were no maintenance planners in place.
  • There was no Reliability Engineer position in place, and no reliability strategy to support asset criticality, Failure Modes and Effects Analysis (FMEA), structured Root Cause Analysis (RCA), reliability data management (OEE), Preventive/Predictive Maintenance strategy, or PM/PdM optimization.
  • The site was preparing to convert from an existing CMMS to SAP, and maintenance personnel had no knowledge or understanding of the requirements or scope of work expected of them during the conversion.
  • Maintenance materials were stored in a central warehouse and in many remote locations, but there were no documented processes in place to control the procurement, delivery, stocking, or kitting of parts to support the maintenance organization.

Sugarcane Operations had recently experienced a reorganization that resulted in the maintenance operation being decentralized and merged into operations, with each farm having a Maintenance Manager and maintenance crews.  With this decentralization came a significant reduction of central shop services and the need for central shops. The central shops that remained were to be used for mechanical harvester rebuilds and other major equipment modifications.  Mechanical harvester maintenance in the field was managed out of the central shop facility during the harvest season and harvester rebuilds were managed in the central shops during the off season.

The LCE project team and the U.S. Sugar Leadership Team developed a Master Plan and Timeline for Success (pictured below) to provide structure and tools necessary to ensure success of the Reliability Excellence implementation.

The Approach

The initial strategic decision by U.S. Sugar leadership was that both the Agriculture and Manufacturing divisions would jointly develop and implement Reliability Excellence processes. In addition to the U.S. Sugar Reliability Excellence Leadership Team, cross-functional Focus Teams were created to focus in the areas of Work Control/Planning, Materials Management, Reliability, and Operational Excellence. These teams initially developed “current” processes describing how the site accomplished all the necessary functions to maintain and repair site assets in support of ongoing operations.

Focus Teams were trained by their LCE coaching team in current best practices in each area of focus. The teams then developed “to be” processes to provide structure and process to support improved methods in accomplishing the maintenance and repair of assets.

Specific areas of focus and contribution for each of the teams included:

Leadership Team

  • Develop the overall strategy and goals for implementation
  • Create the foundation and structure for success
  • Provide leadership in Change Management activities
  • Provide support and guidance to each of the specific focus teams, assisting in resolution of issues and problems, and establishing site rules and guidelines to ensure consistency of effort and product among the teams

Work Control/Planning Team

  • Establish processes and associated metrics to improve maintenance resource utilization and work schedule compliance
  • Establish guidelines and tools to create a partnership between operations and maintenance to improve communication and awareness while improving overall asset reliability and productivity
  • Improve the ability to capture all work in the CMMS and improve maintenance technician efficiency

Reliability Team

  • Establish and create the role of Reliability Engineer, creating focus in the areas of asset criticality, PM/PdM optimization, RCA, FMEA
  • Create focus on three primary areas for rapid improvement (quick wins)  using LCE’s Reliability Action Team (R.A.T.) approach– harvester machine reliability, mechanical elevator reliability, and water control equipment across all farm sites
  • Improve the ability to capture all work in the CMMS and improve maintenance technician efficiency

Materials Management Team

  • Consolidated all materials storage into a single central warehouse facility
  • Eliminate obsolete inventory, avoiding carrying costs and inventory taxes
  • Entered into Vendor Managed Inventory (VMI) and vendor partnerships to reduce overall spend in materials

Operational Excellence Team

  • Develop OEE and loss measurement for the harvest operation
  • Establish guidelines for Operator Care of assets, significantly enhancing safe operation, minor maintenance, and early detection of asset issues by operators
  • Improve the ability to capture all work in the CMMS and improve maintenance technician efficiency

The Results

The Reliability Excellence implementation in the Agriculture Division has resulted in the following improvements:

  • Developed and implemented nearly 40 new “to be” reliability processes
  • Implemented SAP (Maintenance) to align with and support reliability processes
  • Improved from no planning and scheduling to 100% Resource Utilization and 70% Schedule Compliance
  • Improved from having no PM metric and many undocumented PM’s, to 90% PM compliance
  • Kitting and delivery of parts for planned work
  • Developed and implemented overhaul and refurbishment plans
  • Utilizing OEE in the harvesting operation and applied Reliability Centered Maintenance (RCM) principles to the harvesters
  • Through development of an effective dashboard of key metrics, established the ability to compare their operation to international benchmarks
  • Have created the foundation for a culture of Reliability with a growing expectation that equipment runs when needed, how needed, and as long as needed

Implementation of Global Processes for all work streams continues and they are demonstrating significant improvement as these processes mature. Performance metrics have been defined for all areas and are being used by the Agriculture Division Leadership Team to manage the program.

Conclusions

While there is still much work that lies ahead along the journey to Reliability Excellence, the Agriculture Division has created the foundation necessary to achieve benchmark level performance. There have been a number of early accomplishments and successes and feedback from front line Supervision and Management has been very positive. Key Performance Indicators validate the improvements experienced and continue to be used to proactively manage Reliability efforts and results. The process of initial education, assessment, master planning, process design, and implementation supported by Subject Matter Experts has provided U.S. Sugar with the right tools for long-term sustainment and continuous improvement of all aspects of the company operation.